Okidoki Workstation
Okidoki Workstation brings the solid timber legs of the Okidoki tables to desking, softening an open-plan floor. It runs from single desks to 8-person back-to-back benches, at seated (695mm), counter (875mm) or standing (1025mm) heights, with PET or wire cable baskets, perforated veneer screens and accessories such as document holders and personal trays.
At a glance
- 7-year warranty
GECA Level A
AFRDI Green Tick Level A- Lead time 4–6 weeks
Indicative RRP$1,574 – $7,857Depends on the size and finish; choose them below for the exact price. Including GST. Indicative only. Enquire for a project quote.
Series
Sizesrequired25 sizes
FinishesrequiredFrame, Cable tray — PET · 18 colours
Frame
Cable tray — PET
Colours shown are indicative and screens vary. Ask us for samples.
Toprequiredtop
Top (choose one, optional)
We price your top and send it back with the project.
Prices are indicative RRP including GST, added to the size and finish chosen above.
Key features (5)
- Legs — Solid ash, stained walnut or painted seasonal colours
- Frame — Blanc, Noir or seasonal powder coat
- Heights — 695, 875 and 1025mm
- Configurations — 1 to 4 single sided; 2 to 8 back to back
- Warranty — 7 years
- Use
- Indoor
- Lead time
- 4–6 weeks · quick-ship options 2–4 weeks
Sustainability & certification
GECALevel AAustralian Type 1 ecolabel, whole-of-life. Recognised by Green Star.
AFRDI Green TickLevel AFurntech's sustainability mark, against AFRDI 150. Recognised by Green Star.
Thinking Works also holds, at company level (these describe the manufacturer, not this product):
Need the certificates for a submission? Ask us and we will get them from Thinking Works.
Designer files
Spec sheets and technical files for Okidoki Workstation, direct from Thinking Works.
For presentation boards and printed schedules — we'll get the print-resolution files from Thinking Works.
Your selection
- Series
- Size
- Finish
- Options
- Anchor
- RRP
Okidoki Workstation
Need power and data?
Add this workstation to your project list and tell us where power comes from and what each person needs. We'll work out the cables, starters and cable management.
See power & data options →
